Landscape products · Practical application guide
Landscape concrete. Color trial workflow.
Calculate a repeatable pigment batch, then test texture, wet appearance and storage contact on the actual landscape product.

Set the trial around the finished object
A planter rim, rough border and smooth coping can look different with the same pigment. Choose a representative small unit containing a broad face, edge and recess. Identify soil-contact, irrigation and exposed surfaces. For its ordinary concrete base, a 0%, 2%, 3%, 4% dry-pigment comparison can narrow the color, subject to grade suitability. The 2–4% reference is Solomon’s dry-integral-concrete range, not a promise for every landscape formulation. Dose-range source
Do not use extra pigment to solve an unsuitable base hue. Prepare a separate cement or aggregate comparison if the target remains muddy; keep those changes out of the first dosage series.
Weigh a 10 kg-binder color series
The table assumes 10.00 kg total qualifying cementitious material in each independent batch. Exclude sand, coarse aggregate and water from this denominator. Keep the qualified base recipe, including its required water correction, the same for all trials.
| Trial | Dry pigment | Binder | What changes |
|---|---|---|---|
| Control | 0 g | 10.00 kg | No pigment |
| A: 2% | 200 g | 10.00 kg | Pigment only |
| B: 3% | 300 g | 10.00 kg | Pigment only |
| C: 4% | 400 g | 10.00 kg | Pigment only |
If the batch is halved, halve every ingredient: the 3% pigment becomes 150 g for 5 kg binder. Do not halve pigment while keeping binder unchanged. A hypothetical 6 kg-cement facing at 3% needs 180 g; an uncolored backing does not enter that facing’s denominator. This is arithmetic for a separate approved facing design, not a recommendation to create one.
Mix and form enough useful test pieces
- Label at least three specimens from each candidate: retained reference, wet-appearance check and proposed finish. Record their casting order.
- Use the verified mixing sequence for the selected pigment form and mixer. Log dry premix, wet mixing and any hold time. Keep the original concrete water target; measure all changes.
- Fill the real mould or use the production press program. Mark mould position on a concealed surface. Record fill mass, compaction settings and the time to demould.
- Include top surfaces and recesses in inspection. A flat coupon may confirm the matrix hue but will not reveal rim defects or deep-texture marks.
- Apply the intended exposed-aggregate or mechanical finish to a companion before selection. Aggregate exposure affects the observed color. Finish and aggregate guidance
Compare four appearance conditions
| Sample condition | Purpose | Keep controlled |
|---|---|---|
| Cured and equally dry | Choose the base color | Age, light, orientation |
| Clean-water wetted companion | See wet/dry contrast | Wetting method and observation time |
| Finished or sealed companion | Judge the complete surface | Application rate and curing instructions |
| Sample stored on intended spacers | Screen handling marks | Contact material and storage duration |
These are proposed appearance checks, not accelerated durability tests. Photograph before and after each treatment with the same framing. Do not compare a shaded wet sample with a sunlit dry reference. Digital swatches are preliminary: OXERRA notes the influence of raw materials, finish and exposure. Color-selection limitations
Diagnose defects before changing the recipe
| What appears | Check first | Useful next step |
|---|---|---|
| Pale cloudy film | Deposits and moisture movement | Have the producer identify the film; retain a dry control |
| One darker recess | Release residue or local finish | Repeat with controlled mould preparation |
| Marks matching supports | Contact pads or damp storage | Try approved clean spacers on spare pieces |
| Different shade after finishing | Exposure depth or sealer effect | Repeat the complete finish on a matched companion |
CMHA describes efflorescence as one reason concrete paving appears faded and warns that inappropriate cleaning can damage the surface. Its maintenance guidance is background for investigation, not proof that every mark is efflorescence. Surface-deposit guidance Trial a compatible cleaning method on a spare piece, not the accepted master.
Approve a family of products
Arrange several units together with any coping or contrasting edging. Approve the intended range, including wet appearance if relevant, rather than one exceptional piece. Repeat the chosen pigment batch and complete the product’s required performance tests for its service exposure. Keep mould, finish and packing records linked to the batch. Send FUXIN the binder recipe, weighed trials, dry reference and wet/finished photographs so the inquiry describes the actual appearance to reproduce.
Technical references
- Solomon Colors: Dry Integral Colors, dosage and ready-mix instructions
- NPCA: Coloring Precast Concrete
- OXERRA Australasia: Colourmix guidance
- CMHA: Operation and Maintenance Guide for Interlocking Concrete Pavement
Independent technical guidance used for this application overview. These references are not FUXIN project case studies or a substitute for a grade-specific technical data sheet.
