Revetment blocks. Color & wet-dry checks.
Develop the color of approved concrete units without changing the hydraulic, structural or environmental requirements of the revetment.

Identify the unit and the water exposure
An articulating concrete block revetment is an engineered erosion-control system. Its geometry, connectivity, filter layers and hydraulic suitability are outside a pigment tutorial. Use the approved block specification and tell the pigment supplier whether the units will be dry, intermittently wetted or submerged. CMHA treats these blocks as a complete revetment system rather than interchangeable decorative pavers. ACB technical resources
Define the required evidence for water contact and environmental use with the project team. A pigment’s insolubility does not prove every finished block is suitable for every water environment. Do not release experimental colored blocks into a watercourse.
Calculate from the accepted concrete formulation
Select the grade and candidate dose through the approved concrete mix program. For a hypothetical accepted 3% dry-pigment dose on defined binder mass, use the following weighing sheet. This is arithmetic for appearance samples, not an instruction to redesign the blocks.
| Reference binder | Pigment at the selected 3% |
|---|---|
| 25 kg laboratory or pilot batch | 0.75 kg |
| 100 kg manufacturing trial | 3.00 kg |
| 250 kg production batch | 7.50 kg |
If a documented 250 kg binder batch yields 1,000 identical units, its theoretical pigment input is 7.5 g per unit before process losses. Use that only for material accounting; dose the batch by binder mass, never by sprinkling 7.5 g into each mould. Construction-pigment reference literature uses defined cementitious dosage bases and calls for the complete mix to remain consistent. Cementitious colorant guidance
Prepare samples that represent the real block
- Make the uncolored control and candidate using the specified cement, aggregate and additives. Record water correction and actual pigment mass. Do not add water solely to improve wet color.
- Use the same mixing sequence, batch size and forming equipment for the comparison. Label the exposed face and manufacturing date.
- Carry samples through the approved curing route. Keep the coating or surface treatment, if any, as a separately identified variable.
- Include a repeat batch and samples from different documented positions in the run. Preserve some dry references rather than wetting every available specimen.
- Complete the unit’s existing acceptance tests; appearance approval cannot replace those requirements.
Use a repeatable dry–wet comparison
Create a small record for each candidate with the same exposed face photographed dry, uniformly wetted, and dry again. Use a consistent camera position and light. Note wetting water, exposure duration and whether the sample fully returned to the initial dry condition. This is a proposed observation sequence, not a standardized absorption or leaching test.
| Sample record field | Why it matters |
|---|---|
| Mix and pigment lot | Connect appearance to the formula |
| Cure and storage condition | Distinguish material from moisture effects |
| Dry reference image | Establish the original comparison |
| Wet and redried images | Identify reversible darkening or new deposits |
| Required laboratory reports | Keep service acceptance separate |
If immersion, leaching or exposure testing is required, use the method and criteria specified by the qualified project team. Clear-looking water is not evidence of chemical safety.
Troubleshoot without changing the revetment design
A pale film after wetting may involve dissolved salts or deposits; local streaking may indicate dispersion; worn or friable surfaces require a concrete-integrity investigation. Compare the uncolored control before concluding that the pigment has failed. Avoid untested acid cleaning because it can alter a cementitious surface.
| Finding | Next check |
|---|---|
| All wet samples darken and recover | Moisture-condition consistency |
| Persistent white deposits | Water chemistry and moisture movement |
| Colored particles or erosion | Surface integrity and laboratory review |
| Different batch shade | Weighing and raw-material records |
The block producer and engineer should confirm the specified unit and system requirements using the relevant test evidence. Revetment material and design references Send FUXIN the approved mix basis, exposure description and retained dry/wet samples for grade evaluation; do not present a color trial as hydraulic or environmental certification.
Technical references
- CMHA: Articulating concrete block resources
- Davis Colors: Cementitious pigment instructions
- CMHA: ACB material and design references
Independent technical guidance used for this application overview. These references are not FUXIN project case studies or a substitute for a grade-specific technical data sheet.